Aberdeen Harbour (works)Harbour by Thomas Telford (c.1810), Aberdeen, Scotland

Aberdeen Harbour (works), a harbour by Thomas Telford in Aberdeen
Photo: Harbour (1424289317) by Nick Bramhall from Aberdeen, UK, CC BY-SA 2.0
North Pier, Aberdeen Harbour, in stages A scale diagram of Aberdeen’s North Pier in three stages: the earlier pier, Telford’s extension and the 1874 to 1877 extension. earlier pier (Smeaton, 1775–81) about 366 m Telford’s extension, 1810–16 at least 274 m 1874–7 extension 152 m shore pier head: about 792 m (2,600 ft) overall first South Breakwater, 1812: nearly 800 ft (244 m) 050100 m ABERDEEN NORTH PIER IN STAGES Footdee, Aberdeen · Telford advised from 1802 and the extension was built 1810–16
The stage lengths are drawn to scale from published figures: Telford’s extension at least 900 ft (274 m), the 1874–7 extension 500 ft (152 m), the whole pier about 2,600 ft (792 m). The earlier section (about 366 m) is calculated by subtraction, and the first South Breakwater (nearly 800 ft) is shown at the same scale but its position is not.
Type
Harbour
Built
c.1810
Where
AberdeenScotland
Today
In use
Telford's part
Engineer
Location
57.1427, -2.0686

Telford advised on Aberdeen Harbour from 1802, and from 1810 to 1816 the North Pier was extended on his advice by at least 900 feet. The drawing on this page shows the pier's stages to scale.

What you are looking at

The North Pier was built in three stages. John Smeaton's first section dates from 1775-81. Telford's extension, in 1810-16, measured at least 900 feet (274 metres) and ended among rocks that had caused at least five shipwrecks. A third extension of 500 feet (152 metres) in 1874-7 brought the pier to about 2,600 feet (792 metres).

Telford also proposed a large wet dock adjoining the north shore in 1810, and he recommended a South Breakwater. A first breakwater of nearly 800 feet was built in 1812 under Gibb's supervision in consultation with Telford.

Who built it

Telford was consulted in 1802, and from 1811 work began under his direction. His plan of the harbour, drawn in 1810 and amended in 1826, is in Aberdeen's collections. The Aberdeenshire record dates his extension to 1810-13, where Canmore dates it to 1810-16, so the finishing date differs between sources.

The harbour appears on plates 35 and 37 of the Atlas to the Life of Thomas Telford, published in 1838.

Visiting

Check locally before you travel, as access and use can change.

Questions people ask

How long is the North Pier?

About 2,600 feet (792 metres).

How much of it is Telford's?

An extension of at least 900 feet (274 metres), built in 1810-16.

Did Telford build the wet dock?

He proposed one in 1810, but the sources I found do not show that it was built to his scheme.