Bridges · Scotland
Dean BridgeBridge by Thomas Telford (1831), Edinburgh, Scotland

- Type
- Bridge
- Built
- 1831
- Where
- EdinburghScotland
- Today
- In use
- Telford's part
- Designer
- Location
- 55.9530, -3.2140approximate
Dean Bridge carries the road to Queensferry 106 feet above the Water of Leith, on four tall stone arches. Telford designed it as one of his last major works, and it opened up the north-west of Edinburgh for building.
What you are looking at
The bridge has four main arches, each of about 90 feet (27.4 metres) span, and the roadway is up to 106 feet (32.3 metres) above the river. The main arches that carry the road are heavy and rise 30 feet. The footpaths on each side sit on flatter secondary arches of a slightly longer span. Below, in the gorge of the Water of Leith, is Dean Village.
Telford first planned three arches. Trouble with the foundations meant he built four. The parapets were raised later, and the listing dates that alteration to 1912.
Who built it
Telford designed the bridge, and it was built from 1829 to 1831. The contractor was John Gibb of Aberdeen, who had worked with Telford on Aberdeen harbour, and Charles Atherton was Telford's resident engineer. The bridge was finished at the end of 1831, when Telford was 73. It carried the Queensferry road across the gorge on a new line, replacing the older route that dropped down to the river at Bell's Mills, and it let Edinburgh grow to the north-west.
Telford used the same design for the smaller Lothian Bridge, near Pathhead. Dean Bridge is a Category A listed building, and has been since 1965.
Visiting
- Cross it. The bridge carries the A90, and the footpaths on each side sit on their own lower arches.
- See it from below. To see the arches properly, go down to the Water of Leith at Dean Village and look up.
Check the City of Edinburgh Council website for any works or closures before you travel.
Questions people ask
How high is Dean Bridge?
About 106 feet (32 metres) from the river to the roadway.
When was it built?
Between 1829 and 1831.
How many arches does it have?
Four main arches, each about 90 feet across. Telford had planned three.
Is Dean Bridge listed?
Yes, at Category A, the highest grade in Scotland.
Why was it built?
To carry the road to Queensferry across the Water of Leith gorge on a new line, replacing the old route down to the river.