Bridges · England
Over BridgeBridge by Thomas Telford (1830), Gloucester, England

- Type
- Bridge
- Built
- 1830
- Where
- GloucesterEngland
- Today
- Standing (bypassed)
- Telford's part
- Designer
- Location
- 51.8745, -2.2686
Over Bridge is a single stone arch of 150 feet over the West Channel of the Severn near Gloucester. Telford built it in 1825-28 and it opened in 1830. It is a scheduled monument.
What you are looking at
The arch has a span of 150 feet with a rise of 35 feet. Its profile is elliptical over most of the soffit and segmental at the faces, and it was based on Perronet's design for a bridge at Neuilly. English Heritage describes it as about 100 metres long and 30 feet wide.
It sank about 10 inches in all, a few inches when the timber centring was removed and the rest through settlement of an eastern abutment with inadequate foundations.
Who built it
The bridge was started in 1825 and completed in 1828, and it opened in 1830, 90 metres upstream of the earlier bridge. It carried road traffic until 1974, and the A40 now crosses the Severn on a newer bridge alongside it.
It was the lowest practicable crossing of the Severn until the first Severn bridge. Upstream is Mythe Bridge.
Visiting
- Cross it on foot. It is pedestrian-only now and cared for by English Heritage.
- Look for the cow's horn. The corne de vache flaring at the haunches helps floodwater flow.
Check locally before you travel, as access and use can change.
Questions people ask
How long is the span?
150 feet, about 46 metres.
When did it open?
In 1830.
Is it scheduled?
Yes, as a scheduled monument (list entry 1015873).
On the map
Open on the full map · Directions