Telfordways

Every work of Thomas Telford, the Colossus of Roads

Bridges · England

Over BridgeBridge by Thomas Telford (1830), Gloucester, England

Over Bridge, a bridge by Thomas Telford in Gloucester
Photo: Over literally - Gloucester, Gloucestershire - geograph.org.uk - 4558730 by Martin Richard Phelan, CC BY-SA 2.0
Span lengths of nine Telford arch bridges, highlighting Over (1830) Horizontal bars to scale show the arch spans of nine of Telford's bridges. Cantlop (1813) 9.5 m Montford (1792), 3 spans 17.7 m centre Bewdley (1797-9), 3 spans 18.3 m centre Waterloo, Betws-y-Coed (1815) 32.0 m Buildwas (1796, demolished) 39.6 m Holt Fleet (1828) 45.7 m Over (1830) 45.7 m Aldford (1824) 50.0 m Mythe (1826) 51.8 m 01020 m ARCH SPANS TO SCALE Nine of Telford's arch bridges · span lengths only
Span lengths only are drawn, to scale, from the listings and standard references; arch shape, rise and piers are not shown. Dark bars are cast iron and pale bars are stone. Multi-span bridges show each span end to end.
Type
Bridge
Built
1830
Where
GloucesterEngland
Today
Standing (bypassed)
Telford's part
Designer
Location
51.8745, -2.2686

Over Bridge is a single stone arch of 150 feet over the West Channel of the Severn near Gloucester. Telford built it in 1825-28 and it opened in 1830. It is a scheduled monument.

What you are looking at

The arch has a span of 150 feet with a rise of 35 feet. Its profile is elliptical over most of the soffit and segmental at the faces, and it was based on Perronet's design for a bridge at Neuilly. English Heritage describes it as about 100 metres long and 30 feet wide.

It sank about 10 inches in all, a few inches when the timber centring was removed and the rest through settlement of an eastern abutment with inadequate foundations.

Who built it

The bridge was started in 1825 and completed in 1828, and it opened in 1830, 90 metres upstream of the earlier bridge. It carried road traffic until 1974, and the A40 now crosses the Severn on a newer bridge alongside it.

It was the lowest practicable crossing of the Severn until the first Severn bridge. Upstream is Mythe Bridge.

Visiting

Check locally before you travel, as access and use can change.

Questions people ask

How long is the span?

150 feet, about 46 metres.

When did it open?

In 1830.

Is it scheduled?

Yes, as a scheduled monument (list entry 1015873).

On the map

Open on the full map · Directions

Nearby Telford works

More bridgesBack to the map