Canals and aqueducts · England
Standedge Tunnel (completion)Canal tunnel by Thomas Telford (1811), Diggle, England

- Type
- Canal tunnel
- Built
- 1811
- Where
- DiggleEngland
- Today
- In use (boat trips)
- Telford's part
- Consultant (1807 completion plan)
- Location
- 53.5867, -1.9658
Standedge Tunnel carries the Huddersfield Narrow Canal under the Pennines. It is the longest, deepest and highest canal tunnel in Britain. Telford drew up a plan to complete it in 1807, and it opened in 1811.
What you are looking at
The tunnel is about 5 km long. It was started in 1794 and took 17 years to finish. It stays open for boat trips from the visitor centre at Marsden, and boats can pass through with permission. Three railway tunnels run beside it.
Who built it
Benjamin Outram was consulting engineer from 1794, and the work went badly. Flood damage, shortages of skilled labour and unanswered tenders hurt progress, and Outram withdrew. In 1807 Telford was asked to report, and his plan covered costs in detail. Grace's Guide says it was followed to the letter.
Telford's contribution was the plan that completed the tunnel, rather than the original design.
Visiting
- Visit. The Standedge Tunnel and Visitor Centre is at Marsden.
- Take a boat trip. Boat trips run from the visitor centre.
Check locally before you travel, as access and use can change.
Questions people ask
When did Standedge Tunnel open?
In 1811.
What did Telford do?
He drew up the plan for completing it in 1807.
How long is it?
About 5 km, just over 3 miles.
On the map
Open on the full map · Directions